Plus, 5 takeaways from the NY Bight offshore wind auction
Rolls Battery Engineering

Designed for true drop-in replacement in standard BCI sizing, Rolls new R-Series 24V LFP lithium models offer a maintenance-free, lightweight flooded and SLA alternative with fast charge/discharge capability, built-in BMS with operating protections, up to 2x series and 4x parallel connectivity for 48V system configuration and exceptional cycle life (>6000 cycles @ 80% DOD), backed by a 3-year full replacement manufacturer warranty.

Inverters connected to the 3G network will stop communicating when mobile carriers make room for 5G, directly impacting remote monitoring of solar systems.
LG's solar panel business will close by June 30, resulting in the closure of its Huntsville, Alabama module manufacturing facility.

Attend the leading transmission & distribution event at DISTRIBUTECH International®️ May 23-25 in Dallas, Texas and receive 10% off your registration!

The New York Bight offshore wind lease auction fetched a record $4.37 billion from companies looking to develop the waters.
EnBW has announced plans to exit the U.S. offshore wind market only days after its partnership with TotalEnergies won a prized bid in the New York Bight lease auction.
Through the acquisition, Chevron aims to grow its renewable fuels production capacity to 100,000 per day by 2030.
Chris Markwell's journey as an engineer, leader, and person of color in clean energy began with a critical decision to serve.
UPCOMING EVENTS
TODAY: March 2, 2022: Join experts from Black & Veatch and Clarion Energy as they discuss the 2022 Megatrends in Power report, a survey driven look at the industry’s future – and how utilities can and should dive into thoughtful planning and investment now to meet tomorrow’s rapidly changing energy needs with an upgraded, resilient grid for the times.
Join us in our bi-annual Renewable+ Series™️ this April to learn how both offshore and onshore wind continues to grow, and we'll check in with the global state of wind energy. Register for FREE today for both sessions.
Couldn’t make the +series this week? Watch at a time that best suits your schedule.
The company announced on Feb. 22 that its 90,000 sq. ft. Long Beach facility is expected to become operational in the third quarter of 2022.
A leading clean energy developer will explore the development of a green hydrogen hub along the Texas Gulf Coast to support the decarbonization of heavy industry, the parties announced.
Rolls Battery Engineering
facebook  twitter  linkedin 
This email was sent to [email protected].

Contact Us

Clarion Events, Inc. | 110 S. Hartford Ave. | Suite 200 | Tulsa, OK | 74120-1830

Forward to a friend | Privacy Policy | Manage My Preferences/Unsubscribe

To report abuse.