Whether faced with the task of accommodating more users, consolidating data centers, increasing virtualization, improving uptime, or just improving response times, the task of evaluating and implementing all the disparate pieces of compute, storage, networking, load balancing, virtualization, or containerization can prove both arduous and frustrating for the data center manager or the IT administrator. Enter converged and hyperconverged systems. The ability to buy both systems for the data center has led to the need for rack-level power that is as flexible and sophisticated as the systems themselves. Download this brief and find out how an “All-in-1” family of HDOT Cx Alt Phase Pro2 PDUS addresses the power needs of people implementing converged and hyperconverged systems in their datacenter. Sponsored by Server Tech |